JOHNSTON STREET BRIDGE

Quesnel, BC | Our most technically demanding scaffold to date

The Challenge

Engineered plans. Multiple suppliers. Constant scope changes.

The Johnston Street Bridge in Quesnel needed coating work carried on through a BC winter. Paint has to cure, and the environment under the bridge needs protecting. It is our most technically demanding scaffold to date.

The Solution

A temporary roof, erected in two phases.

We built the access and enclosure to the engineer's plans, with independent rolling roofs so the coaters could work in a clean, controlled space and the quality of the coating was protected.

The Result

Only the work zone covered.

Enclosing just the active work zone, instead of the whole structure, meant 45% less scaffold rental and labour for our client, and winter didn't stop the project.

On site

45%less scaffold rental & labour
2 phasestemporary roof, independent rolling roofs
Wintercoating work kept going through the cold

Enclosures | Temporary roofs | Complex access

Winter doesn't have to stop your project.

Talk to our estimating team about your next bridge, industrial or commercial job.

Call 778-910-7285Email [email protected]
← All projects

Copyright © 2026 The Scaffold Group Inc. - All Rights Reserved.